13 Dunbar Road, Bournemouth

by / Thursday, 20 June 2013 / Published in Latest posts

A new build project with an EVA single ply membrane fully adhered to a new OSB plywood decking. The perimeter coping stones were bedded directly onto the single ply membrane.

Leave a Reply

TOP